明明同学累了

Ur great leader(Mars) feel a little tired today. Cos there are so many documents need to be written. Till now, i have finish 8.

First, i must send the feedback from this travel to the ZTE Laos representer. Then send the configuration data to the vice minister of the LTC transmission dept. Finally, send the previous work brief summary to my section chief and replenish the weekly report. My God~

1. Optical Connections between each site
2. Equipment Basic Configuration Information(ID, IP, OW)
3. Description of 2M Usage
4. Description of optical pigtail label
5. Site Monitor Operation
6. Restoring Database Operation
7. Simple Failure Diagnosis

According to ZTE regulations, these files cannot be made public, but i am not afraid to do so.

6 days ago, this page was being read.

,

Subscribe to Comments